|
|
Electricity control system (1) uses the PLC control plan, and compares the distant place being equipped with machine front button in the platform and with the control cabinet, and mutually locks with other equipment, the equipment which at least establishes three above urgent engines off Button.
(2) to be allowed according to need to realize from uses the complete set of equipment work to certain single plane works many kinds of crafts routes, after which the choice needs to process the flow and this processing flow (coating and coating two kind of flows) does not need to start, starts the corresponding equipment according to the flow .
(3) the material in the proportion warehouse cushion warehouse Promotion material position, front end for the material equipment engine off, |
|
|
|
| |

|
|
|
Seed processing complete power distribution cabinet |
|
the material is lower than Promotion material time the position, After time delay front end equipment automatic start, when the material is lower than the yummy treats position, separates by gravity the floor and its for the material equipment is more automatic than knock off, front end relieves for the material equipment waits for an opportunity. When the material is higher than the yummy treats position, compared to separates by gravity the floor and its .
(4) has over-load protection, function and so on single plane auto-stop for material equipment automatically opening machine. When all elevators overload breakdown, front end for the material equipment engine off, after trouble shooting repositions machine .
(5) the material when temporarily the storage bin Promotion material position, front end for the material equipment engine off .
(6) two Cheng Mocang the material when Promotion material, front end gives the material equipment engine off.
(7) loads separately above the scale the cushion warehouse to use the automatic circulation to feed the material installment, when four warehouses simultaneously are in Promotion material the position, front end gives the material equipment engine off.
(8) on the electrical control cabinet is equipped with the technical process simulation chart, the demonstration flow is accurate. The simulation screen opens stops by the traffic light demonstration. Before
(9) the equipment starts establishes the alarm device.
(10) temporarily the storage bin elevator Pipeline disperses the passing place increase minute material direction written comment lamp.
(11) the electrically controlled cabinet increases 2 spare return routes. When
(12) 1# elevator engine off, the cover belt conveyer should stop.
(13) walks the line to use the cable tank spatial frame structure, the platform walks the line threads with 30 angle steels or the thin wall steel pipe. |
| |
|
|
|
|
|